Packing for this Costa Rica order followed the usual export routine: components sorted by assembly group, surface finish protected with foam and film, and the container filled from the far end. Every bundle was checked against the loading plan, and the packing list was signed off before the container was sealed. The order shipped in 2 × 40HQ containers on June 13, 2026. Bundle labels carry the project reference, so any replacement component ordered later can be matched to the original shipment. Selective racking keeps every pallet position directly accessible, which suits warehouses running a wide SKU mix that need to adjust beam levels as stock changes.


