For this Kazakhstan project, the drive-in rack was packed and loaded across 1 × 20GP container. Frames and beams were bundled as matched sets, contact points were protected, and the heaviest components were placed low to keep each container balanced. Loading was checked against the packing list before the doors closed, and the inspection records travel with the shipping documents. The shipment left the factory on September 21, 2026. Photographs of the loaded container were filed with the project records, so the customer could check the shipment against the packing list on arrival. Drive-in racking stores pallets on continuous rails inside each lane, so density rises but access follows last-in, first-out within the lane.


