For this Philippines project, the multi-tier mezzanine was packed and loaded across 4 × 40HQ containers. Frames and beams were bundled as matched sets, contact points were protected, and the heaviest components were placed low to keep each container balanced. Loading was checked against the packing list before the doors closed, and the inspection records travel with the shipping documents. The shipment left the factory on July 15, 2026. Photographs of the loaded container were filed with the project records, so the customer could check the shipment against the packing list on arrival. A multi-tier mezzanine adds working floors inside the building envelope, creating picking levels above the existing storage area without extending the footprint.