This shipment to Russia covered cantilever rack in 1 × 40HQ container. Each bundle was labelled against the project component list, edge protection was fitted, and the loading sequence followed the installation order so the parts needed first sat nearest the doors. Quantities and specifications were checked against the packing list before dispatch, and the shipment left on August 6, 2026. Container loading photos and the signed packing list were sent to the customer before departure, so arrival checks could start from a known baseline. Cantilever racking carries long goods on projecting arms with no front columns in the way, which makes it the usual choice for timber, pipes and profiles.


