Packing for this Thailand order followed the usual export routine: components sorted by assembly group, surface finish protected with foam and film, and the container filled from the far end. Every bundle was checked against the loading plan, and the packing list was signed off before the container was sealed. The order shipped in 2 × 40HQ containers on August 26, 2026. Bundle labels carry the project reference, so any replacement component ordered later can be matched to the original shipment. Very narrow aisle racking cuts the aisle to the minimum the truck needs, trading a little handling flexibility for a clear gain in positions per square metre.